--- title: "Material Tab - Repair Service Overview" slug: "material-tab-repair-service-overview" updated: 2024-09-09T19:41:01Z published: 2024-09-09T19:41:01Z canonical: "docs.profitops.net/material-tab-repair-service-overview" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.profitops.net/llms.txt > Use this file to discover all available pages before exploring further. # Material Tab - Repair Service Overview ## Intro The Materials Tab shows what materials have been allocated to a Work Order, how much of that material has been used, what fleet participated, and how much work, if any, remains. ## Box Count Located at the top of the material tab, the Box Count is a collapsible form that shows the Linear Footage, and Estimated Boxes attached to the Work Order. ![](https://cdn.document360.io/4dbbbe99-c15f-4627-bcb7-ed01495c8269/Images/Documentation/Materials - Box Count Collapsed.png) ### Expanded View When expanded, users can see a complete breakdown of material by location, and a list of any Aggressive Cleaning areas that may need attention. This information is for reference and cannot be changed from the Materials Tab. ![](https://cdn.document360.io/4dbbbe99-c15f-4627-bcb7-ed01495c8269/Images/Documentation/Materials - Box Count Expanded.jpeg) ## Box Management for Repair Services The Box Manager will only appear on repair Work Orders, like Crack Fill, Gap Mastic, and Gap Patch. It shows a list of fleet assigned to the Work Order which can use the required material. The Box Manager tracks the number of material boxes used and by which fleet. The Box Manager will only show fleet matching the material on the Work Order. If a fleet is not shown in the Box Manager, please check the Fleet Tab to ensure it has been added to the Work Order. Instructions for the Box Manager are documented [here.](/v1/docs/box-management-procedure) ![](https://cdn.document360.io/4dbbbe99-c15f-4627-bcb7-ed01495c8269/Images/Documentation/Materials - Box Manager.png) ## Material CheckOut Foreman & Super Permission The CheckOut buttons only appear to Foreman and Superintendents, other users will not be able to select them. ### All Material Entered The “All Material Entered” button appears at the bottom of the material tab when any materials are recorded to a work order. ![Materials - All Material Entered.png](https://cdn.document360.io/4dbbbe99-c15f-4627-bcb7-ed01495c8269/Images/Documentation/Materials%20-%20All%20Material%20Entered.png) ### No Material Entered The “No Material Entered” button appears when no materials have been recorded to a work order. This usually happens due to a Weather Issue. For instructions on how to handle a weather issue, see the [Coat Management Procedure](/v1/docs/coat-management-procedure) or [Box Management Procedure](/v1/docs/box-management-procedure). ![](https://cdn.document360.io/4dbbbe99-c15f-4627-bcb7-ed01495c8269/Images/Documentation/Materials - No Materials Entered.png) ### Material CheckOut Completion Selecting the “All Materials Entered” or “No Materials Entered” button completes the material tab. The name of the completing Foreman or Super, along with the date and time of CheckOut are attached to the tab. No additional changes can be made once the tab has been completed, but Foreman and Superintendents can re-open this tab if additional changes are required. ![Materials - Checkout Stamp.png](https://cdn.document360.io/4dbbbe99-c15f-4627-bcb7-ed01495c8269/Images/Documentation/Materials%20-%20Checkout%20Stamp.png) CheckOut Accountability Foreman & Superintendents are held accountable for information on the Material Tab at the time of CheckOut. Do not press the “All Material Entered” button until you are sure its contents are accurate and complete. A document that includes all the details of an assigned task and outlines a process for completing it. Report generated for each repair Work Order showing how much material is required, and in what areas it should be used. The total estimated linear feet of cracks in a work area to be repaired. The estimated boxes of material required to service a repair area. Targeted heavy duty cleaning in support of surface treatments or road repairs. Tracking system available on the materials tab of repair service work orders. Allows for the reporting of material boxes used during work. Designated role in charge of a work crew. This person reports directly to a Superintendent. A supervisor who oversees multiple Foreman. Any weather related event that prevents a work order from being completed as scheduled. The process of completing and closing a work order after its tasks have been completed. This requires input from the Foreman on site and the Superintendent who oversees them.